Re: Streamline flooring rot

[ Follow Ups ] [ Streamline Message Board ]

Posted by John Donnelly on September 20, 2000 at 17:34:04:

In Reply to: Re: Streamline flooring rot posted by Tom Patterson on September 5, 2000 at 08:47:25:

I removed the front section of floor and replaced it on my 65' "Duke" 25 footer with ease, all the way out. I know about the trailer upper sections being built on top of the floor section, all this takes is a little exertion, some spacer blocks to keep everything from "tweaking" while you make the new section (use a template) and new hardware to replace the rusted out ones. a 3/16" pop rivit gun to reinstall the wall pieces that have to come out (label everything), and last but not least, vinyl flooring glue (2 gallons will do the front dinette/kitchen area on a Duke model)E-mail me if you need more help. It is pretty straight forward once you get going, and it takes about 12 man-hours total to do the job.

Keep on Streamlinin'

John Donnelly

Follow Ups:



HWForums.com Message Forums
Copyright © 2001 HighWired Internet Innovations Inc. All rights reserved.