The Silver Streak E-mail ListArchive Files[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index] Re: [SilverStreak] replacing a floor in the Silver Streak
Jason, I've not done your early model. Have not done SS. All are hand-made and thus each has differences. Have done Streamline and others like Schult. Don't think you need to pull exterior panels and suggest you don't. Suggest doing sections at a time. Yes use marine and none other. You will have to remove old fasteners along perimeter channel into floor as you go. Put aluminum paint on foundation structure as you go. You don't have to work yourself to death prepping those before painting. Rattle can and brushing aluminum paint works good. More is better. You probably need 3/4 and not 5/8. Try to take pictures B4 and after. I would like to see. Use blue tape or other marking labels to keep up with your panels. When reinstalling panels use temporary #8 or #6 Phillips screws to align before tightly riveting. Use huge card board patterns for radius ends if floor too bad for pattern. A big tough hard job that will be so rewarding. I'm in your corner and cheering you on. -Eddie- Houston, TX
|